{"id":4506,"date":"2025-08-11T10:53:02","date_gmt":"2025-08-11T10:53:02","guid":{"rendered":"https:\/\/lbcranes.es\/?p=4506"},"modified":"2025-08-14T10:25:33","modified_gmt":"2025-08-14T10:25:33","slug":"instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall","status":"publish","type":"post","link":"https:\/\/lbcranes.es\/en\/installation-of-5-ton-monorail-overhead-crane-in-llica-de-vall\/","title":{"rendered":"Installation of 5-Ton Monorail Overhead Crane in Lli\u00e7\u00e0 de Vall"},"content":{"rendered":"<p>At LBCRANES, we design and install lifting solutions tailored to each space, optimizing both operational efficiency and safety.<br>On this occasion, we have completed the installation of a 5-ton capacity monorail overhead crane with an 18.5-meter span.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Design adapted to the workspace<\/h3>\n\n\n\n<p>The overhead crane is supported by six braced columns strategically positioned to ensure stability and even load distribution.<br>One of these columns incorporates a metal bracket, allowing us to slightly move the central column closer to the wall.<br>One of these columns incorporates a metal bracket, allowing us to slightly move the central column closer to the wall.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Technical solution and benefits<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Load Capacity:<\/strong> 5Tn<\/li>\n\n\n\n<li><strong>Span:<\/strong> 18.5 meters<\/li>\n\n\n\n<li><strong>Structural Support:<\/strong> Six braced columns<\/li>\n\n\n\n<li><strong>Space optimization:<\/strong> central column adapted with bracket to keep the aisle clear.<\/li>\n<\/ul>\n\n\n\n<p>This design not only meets the lifting needs, but also improves internal workflow and reduces operational risks thanks to a clear space for vehicle and machinery transit.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Commitment to operability and safety<\/h3>\n\n\n\n<p>In every project, we aim for the installation to be not only functional but also to add value to daily operations. In this case, the adopted solution ensures efficient loading and unloading while minimizing interference with other processes in the workshop.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"461\" data-id=\"4509\" src=\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=1024%2C461&#038;ssl=1\" alt=\"\" class=\"wp-image-4509\" srcset=\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=1024%2C461&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=300%2C135&amp;ssl=1 300w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=768%2C346&amp;ssl=1 768w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=1536%2C692&amp;ssl=1 1536w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?resize=18%2C8&amp;ssl=1 18w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image1-1.jpeg?w=1600&amp;ssl=1 1600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" data-recalc-dims=\"1\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"461\" data-id=\"4508\" src=\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=1024%2C461&#038;ssl=1\" alt=\"talleres lli\u00e7a\" class=\"wp-image-4508\" srcset=\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=1024%2C461&amp;ssl=1 1024w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=300%2C135&amp;ssl=1 300w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=768%2C346&amp;ssl=1 768w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=1536%2C692&amp;ssl=1 1536w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=18%2C8&amp;ssl=1 18w, https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?w=1600&amp;ssl=1 1600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" data-recalc-dims=\"1\" \/><\/figure>\n<\/figure>","protected":false},"excerpt":{"rendered":"<p>Optimizamos el espacio y la operatividad en Talleres Lli\u00e7\u00e0 con un puente gr\u00faa monorra\u00edl de 5T y 18,5 metros de luz.<\/p>","protected":false},"author":1,"featured_media":4508,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"footnotes":""},"categories":[7,1],"tags":[17,14,23],"class_list":["post-4506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos-monorrail","category-uncategorized","tag-5tn","tag-industrial","tag-monorrail"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a<\/title>\n<meta name=\"description\" content=\"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/lbcranes.es\/en\/installation-of-5-ton-monorail-overhead-crane-in-llica-de-vall\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a\" \/>\n<meta property=\"og:description\" content=\"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lbcranes.es\/en\/installation-of-5-ton-monorail-overhead-crane-in-llica-de-vall\/\" \/>\n<meta property=\"og:site_name\" content=\"LBCranes Puentes Gr\u00faa Espa\u00f1a\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-11T10:53:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-14T10:25:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"721\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\/\/lbcranes.es\/#\/schema\/person\/4a9a2d864b0c4588e7380e657fc3d751\"},\"headline\":\"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall\",\"datePublished\":\"2025-08-11T10:53:02+00:00\",\"dateModified\":\"2025-08-14T10:25:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/\"},\"wordCount\":262,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/lbcranes.es\/#organization\"},\"image\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1\",\"keywords\":[\"5tn\",\"industrial\",\"monorra\u00edl\"],\"articleSection\":[\"Monorra\u00edl\",\"Uncategorized\"],\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/\",\"url\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/\",\"name\":\"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a\",\"isPartOf\":{\"@id\":\"https:\/\/lbcranes.es\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1\",\"datePublished\":\"2025-08-11T10:53:02+00:00\",\"dateModified\":\"2025-08-14T10:25:33+00:00\",\"description\":\"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.\",\"breadcrumb\":{\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1\",\"width\":1600,\"height\":721,\"caption\":\"talleres lli\u00e7a\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\/\/lbcranes.es\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/lbcranes.es\/#website\",\"url\":\"https:\/\/lbcranes.es\/\",\"name\":\"LBCranes Puentes Gr\u00faa Espa\u00f1a\",\"description\":\"Venta e instalaci\u00f3n de puentes gr\u00faa y sistemas de elevaci\u00f3n para industria.\",\"publisher\":{\"@id\":\"https:\/\/lbcranes.es\/#organization\"},\"alternateName\":\"LBCranes\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/lbcranes.es\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/lbcranes.es\/#organization\",\"name\":\"LBCranes Puentes Gr\u00faa\",\"alternateName\":\"LBCranes Lifting Equipments\",\"url\":\"https:\/\/lbcranes.es\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/lbcranes.es\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/lbcranes.es\/wp-content\/uploads\/2023\/02\/lbcranes_logo.svg\",\"contentUrl\":\"https:\/\/lbcranes.es\/wp-content\/uploads\/2023\/02\/lbcranes_logo.svg\",\"width\":1,\"height\":1,\"caption\":\"LBCranes Puentes Gr\u00faa\"},\"image\":{\"@id\":\"https:\/\/lbcranes.es\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.instagram.com\/lbcranes\/\",\"https:\/\/www.linkedin.com\/company\/lbcranes-lifting-equipments\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/lbcranes.es\/#\/schema\/person\/4a9a2d864b0c4588e7380e657fc3d751\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/lbcranes.es\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/326b5fa52a4764e9816c54fe814752bdf54d3f9bb479db9791962e9861c2755e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/326b5fa52a4764e9816c54fe814752bdf54d3f9bb479db9791962e9861c2755e?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/lbcranes.es\"],\"url\":\"https:\/\/lbcranes.es\/en\/author\/miquelcoll\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a","description":"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/lbcranes.es\/en\/installation-of-5-ton-monorail-overhead-crane-in-llica-de-vall\/","og_locale":"en_GB","og_type":"article","og_title":"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a","og_description":"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.","og_url":"https:\/\/lbcranes.es\/en\/installation-of-5-ton-monorail-overhead-crane-in-llica-de-vall\/","og_site_name":"LBCranes Puentes Gr\u00faa Espa\u00f1a","article_published_time":"2025-08-11T10:53:02+00:00","article_modified_time":"2025-08-14T10:25:33+00:00","og_image":[{"width":1600,"height":721,"url":"https:\/\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#article","isPartOf":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/"},"author":{"name":"admin","@id":"https:\/\/lbcranes.es\/#\/schema\/person\/4a9a2d864b0c4588e7380e657fc3d751"},"headline":"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall","datePublished":"2025-08-11T10:53:02+00:00","dateModified":"2025-08-14T10:25:33+00:00","mainEntityOfPage":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/"},"wordCount":262,"commentCount":0,"publisher":{"@id":"https:\/\/lbcranes.es\/#organization"},"image":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1","keywords":["5tn","industrial","monorra\u00edl"],"articleSection":["Monorra\u00edl","Uncategorized"],"inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/","url":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/","name":"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall - LBCranes Puentes Gr\u00faa Espa\u00f1a","isPartOf":{"@id":"https:\/\/lbcranes.es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage"},"image":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1","datePublished":"2025-08-11T10:53:02+00:00","dateModified":"2025-08-14T10:25:33+00:00","description":"Instalamos un puente gr\u00faa monorra\u00edl de 5T y 18,5 m en Talleres Lli\u00e7\u00e0, optimizando espacio, seguridad y operatividad en la nave.","breadcrumb":{"@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#primaryimage","url":"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1","contentUrl":"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1","width":1600,"height":721,"caption":"talleres lli\u00e7a"},{"@type":"BreadcrumbList","@id":"https:\/\/lbcranes.es\/instalacion-de-puente-grua-monorrail-de-5tn-en-llica-de-vall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/lbcranes.es\/"},{"@type":"ListItem","position":2,"name":"Instalaci\u00f3n de puente gr\u00faa monorra\u00edl de 5Tn en Lli\u00e7\u00e0 de Vall"}]},{"@type":"WebSite","@id":"https:\/\/lbcranes.es\/#website","url":"https:\/\/lbcranes.es\/","name":"LBCranes Puentes Gr\u00faa Espa\u00f1a","description":"Venta e instalaci\u00f3n de puentes gr\u00faa y sistemas de elevaci\u00f3n para industria.","publisher":{"@id":"https:\/\/lbcranes.es\/#organization"},"alternateName":"LBCranes","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lbcranes.es\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/lbcranes.es\/#organization","name":"LBCranes Puentes Gr\u00faa","alternateName":"LBCranes Lifting Equipments","url":"https:\/\/lbcranes.es\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lbcranes.es\/#\/schema\/logo\/image\/","url":"https:\/\/lbcranes.es\/wp-content\/uploads\/2023\/02\/lbcranes_logo.svg","contentUrl":"https:\/\/lbcranes.es\/wp-content\/uploads\/2023\/02\/lbcranes_logo.svg","width":1,"height":1,"caption":"LBCranes Puentes Gr\u00faa"},"image":{"@id":"https:\/\/lbcranes.es\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.instagram.com\/lbcranes\/","https:\/\/www.linkedin.com\/company\/lbcranes-lifting-equipments"]},{"@type":"Person","@id":"https:\/\/lbcranes.es\/#\/schema\/person\/4a9a2d864b0c4588e7380e657fc3d751","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lbcranes.es\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/326b5fa52a4764e9816c54fe814752bdf54d3f9bb479db9791962e9861c2755e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/326b5fa52a4764e9816c54fe814752bdf54d3f9bb479db9791962e9861c2755e?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/lbcranes.es"],"url":"https:\/\/lbcranes.es\/en\/author\/miquelcoll\/"}]}},"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1","uagb_featured_image_src":{"full":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1",1600,721,false],"thumbnail":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?resize=150%2C150&ssl=1",150,150,true],"medium":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=300%2C135&ssl=1",300,135,true],"medium_large":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=768%2C346&ssl=1",768,346,true],"large":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1024%2C461&ssl=1",1024,461,true],"1536x1536":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1536%2C692&ssl=1",1536,692,true],"2048x2048":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=1600%2C721&ssl=1",1600,721,true],"trp-custom-language-flag":["https:\/\/i0.wp.com\/lbcranes.es\/wp-content\/uploads\/2025\/08\/image0-1.jpeg?fit=18%2C8&ssl=1",18,8,true]},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/lbcranes.es\/en\/author\/miquelcoll\/"},"uagb_comment_info":21,"uagb_excerpt":"Optimizamos el espacio y la operatividad en Talleres Lli\u00e7\u00e0 con un puente gr\u00faa monorra\u00edl de 5T y 18,5 metros de luz.","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/posts\/4506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/comments?post=4506"}],"version-history":[{"count":4,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/posts\/4506\/revisions"}],"predecessor-version":[{"id":4519,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/posts\/4506\/revisions\/4519"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/media\/4508"}],"wp:attachment":[{"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/media?parent=4506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/categories?post=4506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lbcranes.es\/en\/wp-json\/wp\/v2\/tags?post=4506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}